Scheduling Loss Percentage for SR Transmission System            
FROM DATE TO DATE SEM LOSS % APPLICABLE PoC LOSS %  
      SLAB I SLAB II SLAB III SLAB IV SLAB V SLAB VI SLAB VII SLAB VIII SLAB IX DATE OF PUBLISHING
20.11.17 26.11.17 2.08 2.04 1.79 1.54 1.29 1.04 0.79 0.54 0.29 0.04 17/11/2017
27.11.17 03.12.17 1.96 1.98 1.73 1.48 1.23 0.98 0.73 0.48 0.23 0.00 24/11/2017